Showing posts with label rushmore hazelnut glaze. Show all posts
Showing posts with label rushmore hazelnut glaze. Show all posts

Sunday, April 17, 2016

Week 9 Progress

Yesterday we got to drive up and see the progress on our house.  Its been a long two weeks wondering what all had been going on there, we played a little guessing game before we went up trying to guess what they had done.  From reading other people's blogs I had an idea of what would come "next" after the drywall but to say we were surprised with all they had done would be an understatement.  I took at least a hundred photos (don't worry I will only share a few) and will try to document all we saw that they had done, though I am sure there are things that I wouldn't be able to pick out that they did.

The first surprise was pulling up to the house and seeing the garage door down (this was the first time we saw it down), the sidewalks in, the driveway in, the soil they put down before the sod laid, and the landscaping already in!!! (Oh and even the mailbox was in!)


The landscaping looks really good and I like it.  I sent pictures to my brother who is a landscape management major at BYU right now, He told me the tall plants by the steps are not going to look aesthetically pleasing long term as they will grow to 15 feet high and they are fast growing.  So we will plan on moving those to the backyard before they get too large to move easily.  For now, I like them. 

Tree in front yard is a Cherry Blossom tree, that will have pretty pink flowers in the spring. 




The column was installed. :)



I had my husband run up and check the door to see if it was unlocked or if we needed to head to the sales office and get the key.  Luckily we could get in.  The first thing we noticed walking into the house was the hardwood floors were installed.


The next big thing we noticed was the kitchen cabinets were in.  We all figured they would be installed by now but we did not expect the granite counter tops to be in!  It was really fun to see the cabinets, counter tops and hardwood floors come together a little bit (they were mostly covered up).

This is the first photo I took of the house on this visit, my husband insisted I take a photo of the sink w/ his hand in it to show just how huge this sink is.  Definitely love the big sink.



The electricity was on in the house.  Thermostats were installed.



The powder room toilet, floors and sink (almost installed).  I was worried about my vinyl flooring choice, was it going to look too cheap but it actually isn't bad, we can live with it.   I don't think we will regret not having extended the hardwood into the mudroom and powder, or tiling the bathroom.  At least not to start with. 



The railings were installed but not stained yet.




The bathrooms upstairs were almost done, tile work was done, cabinets, sinks, faucets, toilets.

Master Shower, just waiting for the glass enclosure now.

Soaking tub tiled, faucet in.

Master Sinks

Kids bathroom

Kids tub, and toilet

Kids bathroom ceiling:  it was a mess in this room, attic insulation everywhere.  Not sure whats going on here, though it looks like they were looking for something.

Other things we noticed in the house were the doors being installed throughout.  The attic access panel and light in one of the master closets.


The inside of the garage.

Another drywall scavenger hunt???  This was in the family room.


The fuse box was labeled.


The tankless hot water heater was installed.


A view of the basement with the insulation on the walls.


Other things done in the house that I didn't mention, the baseboards and shoe molding is in. They had light bulbs in all the lights (some had a pink glow to them, hope that can be fixed).  The light fixtures were installed where there are light fixtures like the master closets, and the dining room.  They had the plastic cap things over all the ceiling fan rough ins. All light switches and electric outlets in (obviously), and smoke detectors. 

Happy surprise with the kitchen cabinets was the soft close drawers.  We wanted those but didn't want to ask for anything special, lucky for us they turned out to be included.  :) 

So in other news we heard this week (only because we asked our SR and then NVR when they sent us an updated closing cost estimate sheet and the "prepaid interest" had only been calculated for 6 days now instead of 31) that our pre-settlement walk through and closing will be the week of May 23rd- closing on May 26th ("firm date" but if changes will let us know). I was getting really impatient because at the rate they were building the house I knew it would be finished earlier than our contracted date and I was worried they might have us close earlier rather than later.  Finding out that they're letting us close the end of May was a little bit of a weight off my shoulders.  Though I am still having a hard time figuring out what we're doing as far as extending our lease a couple weeks or trying to stay with family or friends so the kids can finish school... or just pulling the kids out and being done with school on May 31st. Hopefully we get it figured out for sure this week, its causing more stress than its worth. 

I wrote a separate post last week about this but never posted it-- I am still just trying to just "get over it" and move on.  Seeing the house again helped me to regain some of my excitement that I had lost over this house.  Anyway, and this is totally our fault for not knowing this ahead of time, and we should have been more prepared but I wanted to share this for anyone about to start this process of building with Ryan Homes so that you don't make the same mistake that we did.  I recommend getting a real estate agent, we really thought it would just be one more person we'd have to find and deal with and that we would probably have more luck at getting a better deal if we didn't have  realtor, who would take a 3% commission from Ryan Homes.  I have no idea, how much better or worse of a deal we could have gotten with a real estate agent, however there would have been some extra knowledge and wisdom given to us, especially in the area of the sales contract.  This week when we got the new updated closing cost estimate sheet I,  for the first time noticed just how much we were paying in transfer taxes (dumb I know, but to be fair to myself I have been living in a funk since my mom passed away in December).  It seemed quite high so I did some research.  In PA, where we are building there is a 1% transfer tax from the state and another 1% transfer tax from the county (I think).  Typically this cost is split 50/50 between the buyer and seller.  HOWEVER, and it actually says this in the sales agreement that we are responsible for paying ALL transfer taxes and then in parenthesis it actually says "even if typically paid for by the seller".  ARE YOU KIDDING ME????
Had we known that before we wouldn't have agreed to that.  No way.  It seems very unfair and super shady to throw that into the contract.  We just sold a home in SC last year and we the seller were in charge of the transfer taxes/"deed stamps" (wish we could have made our buyers pay for those, we had a realtor back then how come she didn't tell us to make our buyers pay for that?!?!), never would have imagined this would be part of our closing costs.  So see a real estate agent would have come in mighty handy in this instance.
It makes me sad because why don't they just pay their half?
I have tried to make it okay because of the incentive closing help, however it is supposed to be an incentive for using their lender instead of one of our choice.   If we go with another lender we lose it.
All of this was studied and discovered when they emailed an updated closing cost estimate because their title insurance went up a whooping $600 since we will be closing after May 1st!!  ...Lame.

Okay, I have to stop talking about the transfer taxes and title insurance hike, makes me mad every time.  Probably should have started the post with the annoying stuff and ended with the fun stuff but whatever.  

I don't know when we'll go to see the house again, I imagine they will be finished before we do.  I have tried to make a list of what else needs to be done, (I'm sure I won't think of it all):
carpets, interior painting, exterior painting, front door painted, glass shower enclosure, shower curtain rod, mirror in powder room, appliances, closet shelves installed, garbage disposal, kitchen faucet, drywall touch ups in ceiling and walls, railings stained, cleaning (obviously), garage door opener, numbers on front of the house, sod laid....there really isn't too much more to do.   Before we know it, it'll be time to close and move in. :) 

Saturday, December 26, 2015

Interior Choices

Here are the interior choices we got to make at our appointment HD Interior Supply on Monday December 21st.




Vinyl:  initiator 66180 (Family entry, powder room, laundry room, master bathroom and kids bathroom)
Hardwood:  Dundee 2 1/4 x 3/4" oak stained saddle (Kitchen, morning room, family room, foyer)
Carpet:  Graystone Stone House w/ std. 3/8" midnight pad  (Dining room, study, stairs, and all bedrooms)
Kitchen Cabinets:  Rushmore Hazelnut Glaze
Kitchen countertops:  Granite- New Caledonia
Bathroom Cabinets: (Timberlake Value) Fairfield Honey
Bathroom Countertops and Tile:  White



This appointment was slightly disappointing.  Despite our personal reasons for not having our hearts "in" the appointment, it was shockingly disappointing to realize how FEW options were offered to us at our base point, or even in our already "upgraded" package for the kitchen.  We had 4 or 5 hardwood colors as options, and the only one dark enough for me to even consider is actually the one pictured above and the one we chose.  I wish there had been an option slightly darker.  There would be if we went up another level or two in the hardwood options but that seemed like a waste of money.

The really sad thing was realizing that to get solid wood cabinets and the lighter finishes we would have to upgrade on top of our "luxury kitchen package" which was included as an incentive the month we signed our contract.  For the majority of the appointment we actually had decided to go with  darker cabinet color that was included in our kitchen package, but I knew that if I left with those as my cabinets I would have agonized over it.  The color was too close to the color of the hardwood floors and I really wanted there to be that contrast.  So we had to upgrade to get the Rushmore Hazelnut Glaze cabinets.  I love the cabinets, but I do not love the added cost.

The next thing was the carpet choices.  This had me lose my cool.  I mean seriously, it was so bad that it was funny and had I been in a "better place" in my mind that day I would have taken videos and photos of the level 0 carpets that were included in the base price of our home.  I literally laughed in the poor sales woman's face, and side ranted to my husband about how there was NO WAY I was allowing that "carpet" in my home.  It shouldn't even be able to be called carpet.  It reminded me of what you'd use to make a cat play house sort of thing, or fake carpet in  doll house but carpet in a REAL house for HUMANS... NO WAY!!!!  I wish I had taken photos and videos to share with you all and I am considering going back or going to any carpet store and looking for something comparable.

Our poor SR, I emailed him and ranted a little bit about the sad excuse of standard carpet and seriously recommended they consider throwing that crap out and adding the cost for the level 1 carpet into the base price of the house.  It would add  a couple thousand dollars to the base price sure, but at least they wouldn't come off as a "slimey" home builder- nickle and diming, and using the cheapest materials possible.  

I know I appreciate much more the honest truth up front, knowing exactly what I'm getting for my money.  To have the "standard" flooring options be LESS than what SHOULD be standard left me with a bad taste in my mouth and made me reconsider whether or not this was a good choice to build with Ryan homes.  

Needless to say, that normal looking.. standard looking carpet you see pictured above is... yes you guessed it... an UPGRADE!!!  Can you even believe that?  Well, it is!  Level 1 upgrade... costing just over $1,000 just to have low quality but actual, real live carpet in our two rooms on the main floor and all the bedrooms upstairs.  Holy moly!  I think I will be disappointed in this for a very long time.  It is what it is though, and I'm happy to have my normal carpet (at our expense) over there free, I can't believe its carpet "carpet".  (AHHHHH!!)

Anyway... bathroom cabinets, flooring, tiles, and countertops... it was ridiculous to have to upgrade these things, so we did not.  I hate the cabinets we are getting... we had two ugly options and we chose one... really it could have been either one... didn't matter, both seriously awful.  Same with counterops and tile, and floor... yuck.  But we were upgrading the extension of that hardwood floor into the living room and the foyer, so we didn't have any more money to upgrade with.  We will paint the cabinets, and the sales lady told us on pinterest she saw how to make those countertops look like granite, so maybe we will look into that.  Sad to upgrade the bathrooms to a double sink in the kids and the glassed in shower and soaking tub in the master at a big price tag, and to then go pick out our options and find that to have it look nice like we wanted we have to throw even more money at it.  

Maybe my view point is altered because of what was (is) going on in my life at the time BUT I really did walk out of there feeling happy with the things we "upgraded" but disappointed that we had to "upgrade" certain things and disappointed with some of the "standards" we had to take.  The lack of options that we included were seriously disappointing.  How can there were 2 cabinet options in the bathroom, and three in the kitchen?  The Timberlake website shows so many more options, so I don't know why Ryan Homes doesn't allow you to choose other finishes in even the same categories of cabinets.  I was ill prepared for what was going to be available to me that's for sure.